There will be scheduled power interruptions on the following dates, times and locations:
Monday, April 8, 2019 — 8am to1pm
• Outage type: Sectionalized feeder outage on the Kiya 2 distribution circuit
• Village location: San Antonio
• Power service area(s) affected: Kacho Avenue
• Water service area(s) affected: None
• Wastewater service area(s) affected: None
• Work to be performed: Replace four wooden poles with concrete poles
Monday, April 8, 2019 — 8am to1pm
• Outage type: Sectionalized feeder outage on the Kiya 2 distribution circuit
• Village location: As Gonna • Power service area(s) affected: Flame Tree Road
■ Water service area(s) affected: None
■ Wastewater service area(s) affected: None
• Work to be performed: Replace four wooden poles with concrete poles
Monday, April 8, 2019 — 8:30 A.M. to 1:30 P.M.
• Outage type: Sectionalized feeder outage on the Kiya 1 distribution circuit
• Village location: Obyan
• Power service area(s) affected: Obyan
• Water service area(s) affected: None
• Wastewater service area(s) affected: None
• Work to be performed: Replace seven wooden poles with concrete poles
Tuesday, April 9, 2019 8am to1pm
• Outage type: Sectionalized feeder outage on the Kiya 4 distribution circuit
• Village location: Chalan Kanoa
• Power service area(s) affected: Sunset Drive
■ Water service area(s) affected: None
• Wastewater service area(s) affected: None
■ Work to be performed: Replace five wooden poles with concrete poles
Tuesday, April 9, 2019 — 8:30 A.M. to 1:30 P.M.
• Outage type: Sectionalized feeder outage on the Kiya 1 distribution circuit
• Village location: Obyan
• Power service area(s) affected: Obyan
• Water service area(s) affected: None
■ Wastewater service area(s) affected: None
■ Work to be performed: Replace seven wooden poles with concrete poles
Wednesday, April 10, 2019 — 8am to4pm
• Outage type: Sectionalized feeder outage on the Kiya 1 distribution circuit
• Village location: Dandan
• Power service area(s) affected: Dandan Road
• Water service area(s) affected: None
• Wastewater service area(s) affected: None
• Work to be performed: Replace nine wooden poles with concrete poles
Thursday, April 11, 2019 — 8am to 4pm
• Outage type: Sectionalized feeder outage on the Kiya 1 distribution circuit
• Village location: Dandan
• Power service area(s) affected: Dandan Road
• Water service area(s) affected: None
• Wastewater service area(s) affected: None
• Work to be performed: Replace seven wooden poles with concrete poles
Friday, April 12, 2019 — 8am to 4pm
• Outage type: Sectionalized feeder outage on the Kiya 1 distribution circuit
• Village location: Dandan
• Power service area(s) affected: Dandan Road
• Water service area(s) affected: None
• Wastewater service area(s) affected: None
• Work to be performed: Replace seven wooden poles with concrete poles
Saturday, April 13, 2019 — 8am to 4pm
• Outage type: Sectionalized feeder outage on the Kiya 1 and Kiya 2 double distribution circuit
• Village location: As Terlaje and Susupe
• Power service area(s) affected: Susupe and Chalan Kanoa
• Water service area(s) affected: As Terlaje Booster Tank
• Wastewater service area(s) affected: W-6 and W-8
• Work to be performed: Replace seven wooden poles with concrete poles
Sunday, April 14, 2019 — 8am to 4pm
• Outage type: Sectionalized feeder outage on the Kiya 1 distribution circuit
• Village location: Dandan
• Power service area(s) affected: Dandan Road
• Water service area(s) affected: None
• Wastewater service area(s) affected: None
• Work to be performed: Replace seven wooden poles with concrete poles
The purpose of the scheduled power interruptions is to de-energize utility lines and allow power line workers from Commonwealth Utilities Corp. and its contracting company, Primary Source Electric, to safely replace 70 wooden poles with concrete ones.
Because of the scale of work that will be performed, CUC asks travelers to take alternate routes or to exercise caution when driving through the working area.
For more information, contact the CUC Customer Call Center (664-4282) or monitor our Facebook page for the latest updates (https://www.facebook.com/CommonwealthUtilitiesCorporation/).(PR)