Scheduled power interruptions
The Commonwealth Utilities Corp. would like to inform the public that there will be scheduled power interruptions on the following dates, times and locations:
Friday, March 22, 2019 – 8am to 4pm
• Outage type: Sectionalized feeder outage on the Kiya 1 and Kiya 2 double distribution circuit
• Village location: As Terlaje
• Power service area(s) affected: As Terlaje and Lower San Vicente
• Water well(s) affected: As Terlaje Booster
• Water service area(s) affected: None
• Wastewater service area(s) affected: W-6
• Work to be performed: Replace ten (10) wooden poles with concrete poles
Saturday, March 23, 2019 – 8am to 4pm
• Outage type: Sectionalized feeder outage on the Feeder 4 distribution circuit
• Village location: Kagman Mobile Gas Station and Kagman 1
• Power service area(s) affected: Kagman 1, Kagman 2 and Kagman 3
• Water well(s) affected: All Kagman Wells
• Water service area(s) affected: Entire Kagman Area
• Wastewater service area(s) affected: None
• Work to be performed: Replace two (2) wooden poles with concrete poles
Sunday, March 24, 2019 – 8am to 4pm
• Outage type: Sectionalized feeder outage on the Feeder 4 distribution circuit
• Village location: Kagman 1 and Kagman 2
• Power service area(s) affected: Kagman 1, Kagman 2 and Kagman 3
• Water well(s) affected: All Kagman wells except KG-2, KG-3, KG-4, KG-10 and
• KG-131
• Water service area(s) affected: Entire Kagman Area
• Wastewater service area(s) affected: None
• Work to be performed: Replace seven (7) wooden poles with concrete poles
Monday, March 25, 2019 — 8am to 4pm
• Outage type: Sectionalized feeder outage on the Kiya 1 and Kiya 2 double distribution circuit
Village location: As Terlaje
• Power service area(s) affected: As Terlaje
• Water service area(s) affected: None
• Wastewater service area(s) affected: W-6
• Work to be performed: Replace five wooden poles with concrete poles
Tuesday, March 26, 2019 — 8am to 4pm
• Outage type: Sectionalized feeder outage on the Kiya 1 and Kiya 2 double distribution circuit
• Village location: As Terlaje
• Power service area(s) affected: As Terlaje and Fina Sisu • Water service area(s) affected: None
• Wastewater service area(s) affected: W-6 and W-8
• Work to be performed: Replace five (5) wooden poles with concrete poles
Wednesday, March 27, 2019 — 8am to 4pm
• Outage type: Sectionalized feeder outage on the Kiya 1 and Kiya 2 double distribution circuit
• Village location: As Terlaje, Lower Dandan, Airport Road
• Power service area(s) affected: Lower Dandan and Airport Road
• Water service area(s) affected: None
• Wastewater service area(s) affected: A-13 and A-14
• Work to be performed: Replace five wooden poles with concrete poles
Thursday, March 28, 2019 — 8am to 1pm
• Outage type: Sectionalized feeder outage on the Feeder 1 and Feeder 3 double distribution circuit
• Village location: Garapan Middle Road
• Power service area(s) affected: Upper Navy Hill
• Water service area(s) affected: China Town, Upper and Lower Navy Hill, As Falape and Chalan Galaide
• Wastewater service area(s) affected: S-8
• Work to be performed: Replace one wooden pole with a concrete pole
Thursday, March 28, 2019 — 8am to 4pm
• Outage type: Sectionalized feeder outage on the Kiya 4 distribution circuit
• Village location: Susupe
• Power service area(s) affected: Susupe and Chalan Kanoa
• Water service area(s) affected: None
• Wastewater service area(s) affected: A-5 and A-11
• Work to be performed: Replace five wooden poles with concrete poles
The purpose of the scheduled power interruptions is to de-energize utility lines and allow power line workers from the company Primary Source Electric to safely replace wooden poles with concrete ones. This is a continuation of CUC’s ongoing restoration effort, which is aimed at hardening and strengthening the power distribution system affected by Super Typhoon Yutu.
Because of the scale of work that will be performed, CUC asks travelers to take alternate routes or to exercise caution when driving through the working area.
For more information, contact the CUC Customer Call Center (664-4282) or monitor our Facebook page for the latest updates (https://www.facebook.com/CommonwealthUtilitiesCorporation/). (PR)